Master schedule and rough-cut capacity

Build a week-by-week plan of what to make for each item and plant from your forecasts, customer orders and stock. Change the plan where you know better, firm the sure weeks into production orders, and check the load on each machine before you commit.
PLANSScale only

The problem it solves

  • The plan for the next three months is a sheet nobody updates when an order lands.
  • You commit to a quantity and find out in week two that the press shop cannot make it.
  • Stock runs out in week six because nobody worked forward from today's stock.

How it works

  1. Your planner opens Manufacturing > Planning > Build the Master Schedule, picks the plant and the weeks ahead (12 to start with), and presses Build.
  2. For each item and week you see the forecast, the customer orders and the demand (the larger of the two). You also see the plan to make, the stock at week end and the machine hours. Weeks where stock goes below zero show in red.
  3. Change Plan to Make where you know better. Your figure is kept when the schedule is built again, and the stock at week end is worked out again at once.
  4. Open Rough-cut Capacity, pick the plant and press Check. Each machine and week shows the hours needed against the hours it works; above 85 % is amber and above 100 % red.
  5. Select the sure weeks and press Firm. Each becomes a confirmed production order from the item's bill of materials, starting on that Monday.

Everything it does

Building the schedule

  • Per plant, from this week's Monday, for the weeks ahead (12 to start with)
  • Items: those you pick, or every item with a forecast and a bill of materials
  • Forecast: each month's forecast spread evenly over its days into weeks
  • Customer orders: deliveries to customers not yet done, by week (late ones in this week)
  • Demand: the larger of forecast and customer orders
  • Plan to Make: enough to keep stock at the safety stock (0 without the MRP feature), sized by the item's order size rule
  • Stock at Week End: today's stock in the plant, plus plans, less demand, week by week
  • Machine Hours: the plan times the hours one unit needs on its bill of materials' steps

Changing and firming

  • Plan to Make is editable; a changed line is marked Set by Hand and kept on the next build
  • Firm: a confirmed production order per line, from the item's bill of materials, starting Monday 08:00; the line is greyed and kept
  • Firm refuses an item with no bill of materials
  • Filters: Not Firm, Stock Below Zero; group by item; pivot view
  • Every change is kept in the line's history

Rough-cut capacity

  • Per machine and week: hours needed, hours it works (from its calendar times its capacity; 168 hours a week with no calendar) and load %
  • Load above 85 % in amber, above 100 % in red
  • Counts every master schedule line of the plant with a plan to make

With the MRP run

  • Safety stock and order size rules of each item are used by the schedule
  • For weeks not firm, the forecast above customer orders becomes demand in the MRP run

Who uses it

PlannerBuilds the schedule, changes plans, checks capacity and firms weeks.
Production ManagerAgrees the plan and the load per machine before weeks are firmed.
SupervisorCan read the master schedule.

Where you use it

  • Web: Manufacturing > Planning > Master Schedule, Build the Master Schedule and Rough-cut Capacity (planners and above)
  • Not in the SmartMy Manufacturing app (built and in testing, not in the app stores yet): this screen is on the web

What you control

Settings

  • Per build: plant (the Entity's first plant to start with), weeks ahead 12, items
  • Per item: safety stock and order size (from the MRP feature)
  • Per machine: working calendar and capacity, for the rough-cut check

Questions

Will building the schedule again undo my changes?

No. Lines you set by hand and firm lines keep their plan. The rest are worked out again from the latest forecasts, orders and stock.

Does firming buy the materials?

Firming makes confirmed production orders. Run MRP to propose what to buy for them.

Is rough-cut capacity a finite schedule?

No. It adds up the hours each week's plan needs on each machine and compares them with the hours it works. The scheduling board places the actual jobs.

Can I plan by month?

The schedule is by week. Forecasts are by month and are spread into the weeks.

Which plan has the master schedule?

Scale, with forecasts and rough-cut capacity.